naar3fasen.nl
Transparent prices

What does it cost? Just an honest overview.

No 'price on request' and no small print. Below you'll find all indicative prices: what you pay us for the installation work, and what the grid operator charges. The exact price for your situation comes upfront — fixed and without obligations.

Installation work (through us)

Indicative prices including installation and VAT. After the intake you receive a fixed price for your situation.

WorkIndicative price
Fuse box replacement (single phase)from € 649
Fuse box replacement (3-phase)from € 899
Adding an extra circuit€ 100 – € 250 per circuit
Cooking circuit / Perilex connection€ 150 – € 350
Meter cupboard adjustments (layout, ventilation)indication in the quote

Grid operator costs (paid directly to the grid operator)

You pay these one-off costs (2026 rates) directly to your grid operator — we earn nothing on them. We help with the application via mijnaansluiting.nl free of charge.

Service2026 rate
Upgrade to 3×25A — Liander€ 368.77
Upgrade to 3×25A — Enexis€ 275.15
Upgrade to 3×25A — Stedin€ 258.95
Replacing melt fuse with circuit breaker — Liander€ 635.07
Entirely new 3×25A connection€ 1,661.94

Regional grid operators (such as Coteq or Rendo) apply similar rates. We'll find out which grid operator serves your address.

And per year? With 3×25A little changes.

The fixed grid costs depend on the capacity of your connection. The good news: the standard 3-phase connection costs virtually the same per year as what you probably pay now.

3×25A — the standard choice

± € 346 per year

Virtually the same as a standard 1×35A connection (Liander rate). Your monthly costs barely change.

3×35A — rarely needed

± € 1,459 per year

Considerably more expensive, and virtually never needed for homes. We only recommend this for exceptionally high usage.

What does the complete switch to 3-phase cost?

usually € 1,200 – € 1,800

A new 3-phase fuse box plus the grid operator upgrade, depending on the number of circuits and the state of your meter cupboard. If you already have 3 phases inside, you're often done from € 899.

All amounts mentioned are indications based on common situations and the 2026 grid operator rates. After the intake you receive a fixed price for your situation — and we stick to it. No hidden costs, no surprises afterwards.

Want to know what it costs in your situation?

Answer a few short questions and receive a personal price estimate within 1 business day — free and without obligations.

Request a free price estimate

No obligations. No pushy sales calls.